IRONING/
QUALITY CONTROL/PACKING
After sewing, the products are transferred to the ironing and
packing department which has a capacity of 8.000 pcs/day. In this
department under the control of experienced staff and according
to customer requirements, they are ironed, packed and made ready
for shipment.
| |
|
 |
All ironed products
are measured and checked. Only ones which have successfully
passed quality control checks are sent for packing.
|
|
| |
|
| Goods are folded and prepared for shipment
according to the customers’ requirements. |
|
 |
| |
|
 |
If required by
the customer, all products pass through the needle
control machine to check for lost needles before the
goods are boxed. |
|
| |
|
Boxes ready for
shipment are transferred to the warehouse by conveyor
belt. |
|
 |